Video highlights of the project.
Windows Media
Low /
Med /
High
Apple Quicktime
Low /
Med /
High
Real Media
Low /
Med /
High

Edith M. Brack Building being remodeled

Project Manager, David Ratcliff of
McKenzie Roofing & Remodeling

Two
1-800-GOT-JUNK trucks were filled
to the brim with
debris

Pulling up the old carpet

Ceiling tiles were removed

David Laurer of
Dacon Roofing
taking a
breather

Interior windows removed for fill-in

Cabinets and fixtures removed

The
1-800-GOT-JUNK girls cleaning up.
Even the kids
were involved!

Ceiling tile insulation reclaimed for use
later

Busy workers getting the job done. Sometimes
there were lines waiting
to get to the trucks!
|
The
Children's Shelter
Volunteer Project
A very special project was undertaken on a volunteer basis by the
San Antonio chapter of NARI. As an organization we are
remodeling the abandoned Edith M. Brack administrative building on
the Children's Shelter
campus at 2939 W. Woodlawn to
provide additional administrative office space to the managers of
the Children's Shelters in the San Antonio area. 8/20/2005 -
The demolition phase of the project progressed nicely as 24
people representing 8 NARI member
businesses (McKenzie Roofing &
Remodeling,
1-800-GOT-JUNK,
Ferguson Bath & Kitchen Gallery,
Dacon
Roofing, Home Depot,
Maverick Remodeling &
Hughes Custom Flooring)
labored under less-than-perfect conditions. The hot and dirty
demolition work filled to the brim two
1-800-GOT-JUNK trucks with old
carpet, ceiling tiles, cabinets, fixtures & insulation. David
Ratcliff of
McKenzie Roofing & Remodeling, the project
coordinator, said that “It was a tremendous start for the NARI
building at the Children’s Shelter. This fantastic work day shows
the heart of so many of the people in the remodeling industry.
It’s because of caring folks like this the children thrown into
difficult situations may have a better start. Thanks to everyone who
participated.” A total of 81 man/hours were spent from 8:00am to
11:30am. All carpet, ceiling tiles, cabinets & fixtures were
removed. Some ceiling tiles were reclaimed for use later in the
project. Much thanks to
Ferguson Kitchen and Bath Gallery which
turned out 11 volunteers for getting this project off to a great
start. Also thanks to
1-800-GOT-JUNK's Mark Klug for providing 2 trucks for the
hauling off and disposal of the construction debris. Trades and
Materials
The following trades and materials are still needed for the NARI
building. If you have any contacts for either the trades or the
supplies, please help by contacting Call David Ratcliff at MacKenzie Roofing and
Remodeling. (210) 732-7326 Cell:(210) 287-2376
Important:
- We need 3 of the specialty trades - Electrical,
Mechanical & Plumbing - volunteers to be identified and
complete their work before we can set another work day.
- The block installation can be done at any time.
- The exterior prep and painting can be done as soon as the
roof is replaced the week of 8/22.
Trades / Tasks
- Demolition - Completed
- Remove existing chalkboards, countertops,
sinks and cabinets.
- Remove flooring.
- Remove damaged ceiling
tiles.
- Remove 6 interior windows.
- Remove 2 accordion doors.
- Remove wood shelving in small storage rooms.
- Haul off debris. (1-800-GOT-JUNK?)
- Exterior Paint
- Power wash entire exterior, including
brick veneer
- Caulk stucco cracks
- Caulk window/masonry joints
- Brush, prime, and paint metal window
lintels
- Paint stucco siding and soffit
- Prepare, prime, and paint fascia and
north patio cover
- Doors
- Install doors and adjust for proper
operation. (Dacon Roofing &
Remodeling)
- Cut the active door to the large room to
make a Dutch door. (Dacon
Roofing & Remodeling)
- Install locksets individually keyed with
master
- Rekey entry locks on main doors, replace
north door locks keyed to main entry
- Install missing air grills
- Flooring
- New carpet in all offices
- New vinyl tile in the hall, storerooms,
and bathrooms. (Hughes Custom
Flooring)
- New vinyl base
- Plumbing
- Cap unused drains and supply lines
- Install new commodes, wall hung vanities,
and faucets. (Supplied by
Ferguson)
- Install water supply and drain and
install new fountain in hall
- Install water supply and drain and
install new sink with faucet in break room. (Supplied by
Ferguson)
- Check gas for water heater and furnace,
gas test for meter installation
- Electrical
- Check service for electrical connect
- Check all plugs and switches. Repair or
replace bad ones
- Check all light fixtures and re-lamp or
re-ballast as needed.
- Install new vents in bathrooms
- Install new light fixtures in the entry
and janitor closet
- Install exterior lights
- HVAC
- Check system for proper operation
- Install new thermostat
- Replace/Repair duct system as needed
- Detach and reset all vents for new
ceiling tile installation
- Interior Paint
- Caulk as needed for preparation
- Paint all interior walls
- Paint door units
- Miscellaneous
- Remove and replace roof and rotten
fascia. (MacKenzie Roofing &
Remodeling)
- Install cinder blocks at removed windows
and doors
- Install ceiling insulation and tiles in
offices
- Install ceiling insulation and drywall in
entry. Tape, float, and texture
- Install cabinets and countertop in break
room (Supplied by Pride Home
Improvement)
- Install refrigerator and microwave oven
(Supplied by Stone Appliance
Co.)
- Final cleaning including windows
Materials
|
Qty |
Item |
Cost Ea |
|
Doors |
|
10 ea |
Individually keyed interior
locksets with a master key. |
$ 25.00 |
|
2 ea |
Exterior keyed locksets and
rekey the 2 main entrance doors. |
$ 25.00 |
|
2 ea |
Privacy locks for the
bathrooms. |
$ 20.00 |
|
Ceiling |
|
18 sheets |
5/8” drywall for entry
ceiling |
$ 8.00 |
|
25 bundles |
2x4 ceiling tile |
$ 25.00 |
|
5 rolls |
R-19 batt insulation 24”
wide |
$ 30.00 |
|
Paint |
|
10 gal |
Exterior wall and soffit
paint |
$ 25.00 |
|
3 gal |
Exterior fascia and trim
paint |
$ 25.00 |
|
10 gal |
Interior door and trim paint |
$ 25.00 |
|
30 gal |
Interior wall paint |
$
25.00 |
|
36 tubes |
Latex caulk |
$ 1.00 |
|
Miscellaneous Items |
|
198 ea |
8x8x16 cinder blocks |
$ 5.00 |
|
8 bags |
Mortar mix |
$ 9.00 |
|
1 ea |
Water fountain |
$ ??.00 |
|
132 ea |
4’ florescent light bulbs |
$ 1.00 |
|
?? ea |
Light fixture ballasts |
$ 20.00 |
|
2 ea |
Bathroom vents |
$ 45.00 |
|
10 ea |
Ceiling light fixtures |
$ 35.00 |
Proposed Administration Building Floor Plan
 |